Pre-construction:
· The quartz stone products must be
prevented from throwing or collision to avoid any invisible cracking or damages
during the transportation and shipment.
· The quartz stone products must be
protected from raining or sunshine by covering with the canvas during outdoor
storing.
· The cement mortar for installation should not be too much
moisture-bearing. Otherwise, it might result in two problems happening:
1. A thin layer of vapor might generate and exist between the cement motor and
the quartz stone tile resulting in unsound adhesion.
2. The vapor would
continue to effect the secondary reaction with the cement mortar as it is
impossible to be evaporated under the quartz stone tile, which might result in
the tile’s rake angle, hollowness or cracking afterwards.
· The cement must
be mixed round with the sand mortar evenly and completely so as to get the best
and perfect adhesive force.
· Supposed the white cement is adopted for the
installation, it is a must to test and inspect its quality since lots of
unqualified white cement exists in the market.
Under-construction:
A. Wall tiling:
· Clear up and raze the wall to be free from
roughness and unevenness.
· Mix up the cement with water to be the paste
and brush it onto the wall twice.
· Fix the quartz stone tile onto the wall
firmly with the iron wire and expansion bolt.
· Mix the cement with sand
pro rata 1:3 together with an amount of water and fill this mortar into the
space between the wall and tile.
· Clean the tile surface from mortar and
dirt.
· The wet cloth should be applied onto the tile for 24 hours after
installation in case it is under the direct sunshine for protection.
B.
Floor tiling:
· Mark the horizontal base line and then make the whole
ground to be leveled with this line.
· Mix the cement with sand pro rata
1:4 together with an amount of water till to be in the state of damp dry.
·
Lay the abovementioned mortar on the ground up to 30mm or 40mm high and then put
the tile onto the mortar layer for adjusting the height.
· Take out the
tile after the height adjustment and brush one layer of dedicated adhesive onto
the cement mortar. In case that the dedicated adhesive is unavailable, the high
graded black cement can be the substitute that should be laid onto the back side
of tile.
· Lay the tile onto the mortar layer evenly and knock it slightly
with a rubber or wooded pestle to achieve the tightest junction between the tile
and mortar. Meanwhile, the tiles’ levelness and the border joint between tiles
should be adjusted accordingly. Those tiles whose surface is out of level with
other tiles must be removed and the levelness of the base mortar layer must be
re-adjusted. Then to repeat the previous two steps.
· A seam of 2mm wide
should be kept between the tiles under normal conditions for the moisture
evaporation and counteraction of swelling stress. When the quartz stone tiles
are applied in large scale, the shrinkage joint should be kept at certain
distance to avoid any popup or cracking of the tile resulting in the land’s
expansion or shrinkage.
· Seal the joint after 3 to 5 days after
installation to let the bottom layer of cement mortar be dried completely.
Rushed sealing joint would seriously affect the decorative effect since the
chemical species continue the hydration resulting from too much moisture
contained inside the land and cement mortar. To achieve a better decorative
effect, the dedicated gap filler agent or white cement is recommended to use for
sealing the joint and the overflowed filler agent or cement should be cleared
immediately.
Maintenance:
· Never walk or put any heavy cargos on the quartz stone after the
installation until the cement mortar is completely hardened which takes at least
24 hours, to protect it from unevenness.
· The protective film on the
quartz stone should not be removed after installation until all of the
in-process projects are finished completely.
· At the entrance and exit of
the quartz stone flooring area, the carpet or footcloth should be used for
protection from wearing or scraping of the hard items such as sand or
stone.
· Apply the maintenance or reconditioning to the stone regularly so
as to keep it perfect, luxurious and clean all the time.