Customization Design 20mm Marble Office Top

Min Order : 1 Pieces
Material:

Stone Name:

Black - Marble

Origin:Hong KongHong Kong

Supplier Detail
ANYO HONGKONG CO., LTD
Established: Dec 28,2000
Hong Kong Hong Kong
Main Product:

Malaysia Randy Beige (white) , Malaysia Randy Beige(Yelllow), Malaysia Randy Silver Line, Malaysia Dream Beige , Malaysia Cloud Beige, Marble Block/Slab/Tile

user img
Ms.Kara Tang
Tel: +86-15296495209
Adr: ROOM 1502 EASEY COMMERCIAL BUILDING,253-261 HENNESSY ROAD WANCHAI HONGKONG
Visit Store
Product Description

Material:Natural stone or your request


Surface Choice:Polished, Honed, Grooved, Inclined, Stripped, Tumbled, Antique, Brushed, Picked, Water-hydraulic, Acid washed, Waterproof, etc.


Product Choice:Dry-hangs, Cut-to-Sizes, Panels, Slabs, Tops, Sanitary, Blocks, Stair Steps, Paving, Curbs, Columns, Pillars, Tombstone, Sculptures, Fountains, Lanterns, Pots, Tables, Chairs, Lines, Meshed Paving, Mosaics, Cultural Marbles etc.


Common Sizes:The below sizes are common ones, the close INCH sizes can also be produced.


Panels

Size(mm):300X300, 300X600, 600x600, etc.

Thickness(mm):10, 18, 20, 30, etc.


Slabs

Size(mm):1500upx600, 2400upx650,2100upx1200up, etc.

Thickness(mm):16,17,20,30, etc.


Countertops

Size(mm):1800x560, 2100x560, 2400x660, etc.

Thickness(mm):20, 30, etc.


Vanity Tops

Size(mm):1200x560, 1500x560, 1800x600, etc.

Thickness(mm):20, 30, etc.


Stair Steps

Size(mm):Lx457, Lx330, Lx250, Lx300, Lx200, etc.

Thickness(mm):20, 30, etc.


Laminate Panels

Size(mm):600x300, 300x300, etc.

Thickness(mm):10-12


Cultural Stone

Size(mm):600x150, 350x180, etc.

Thickness(mm):10-30


Mosaics

Size(mm):305x305

Thickness(mm):10-20


Package:(Poly) Wooden Crate, Pallet, Rain Cloth, Carton & Foam are Our Usual Packing Material, But Different Product Different Pack, Different Pack Different Cost.


Payment:30% deposit, balance should be paid before delivery.


Port:China port


MOQ:100m2 (Principally 1 full container at least, but mix loading in the same port is allowed).


Supply ability:About 1000m2/week.


Delivery30-35 days after manufacturing begins.


Categories:
Related Searchs: