V Screw Pro - Biologic Waste Water Clarifier for the Stone Industry

Stone Factory MachinesStone Factory Cleaning EquipmentsWater Treatment Equipment

BIOGERIA Italy Italy

Usage: Granite, Marble, Artificial Stone, Basalt

Machinery Function Features
V SCREW PRO BIOLOGIC CLARIFICATION
A new product with a new technical solution, the helical lamina pack, to satisfy any recycling water need. Thanks to its performances,
V SCREW PRO is able to optimize the production, cutting down the charges for the purchase of drinking water and for the mud disposal.
OUTPUT
V SCREW PRO clarifies up to 130 lt/min.
WASTE WATER PUMP
V SCREW PRO drafts the waste water by a high-head immersion pump from a collection pit (existing or to built). The pump is fully automatic.
CONSTRUCTION
Any Parts that have contact with water and mud are built completely in PVC or aluminium, which guarantees a long lifetime of the clarifier.
There are no moving parts which cut down the time for the maintenance.
FUNCTION SHORTCUT
The solid mud is worked in the lower part of the clarifier while, thanks to the helical lamina pack , the smallest parts of mud are worked in the higher side. At the end of the process, the mud get extracted by a manual valve while the clarified water is ready to be reintroduced into the production. The mud extraction, 2 ore 3 times a day, is controlled manual by a valve.
NEW DESIGN
Thanks the helical lamina pack it is possible to reach the performance of inclined compact clarifier with this small dimensioned silos.
NO CHEMICALS
BIOGERIA uses no polyelectrolyte solution (flocculants) to speed up the process.
WASTE WATER DRAFT
An immersion pump is positioned into the waste water collection point. A swim switch that is delivered with the pump controls the water level in your pit.
FIRST CYCLE OF BIOLOGIC DEPURATION
In this phase the water slows down its flow, maximizing the settling. The lower part of the clarifier eliminates the biggest mud parts.

SECOND CYCLE OF BIOLOGIC DEPURATION
The water rises through a lamellar section and to the special designed circular overflow system to complete the clarification process. At the end the water is ready to be reintroduced into the production and get stored in the clean water deposit. The second cycle eliminates most of the finest mud particles
MUD EXTRACTION
The mud decanting at the bottom of the clarifier. A manual valve allows the output of the mud.
Consumables
After-Sale
Supplier Detail
BIOGERIA
Established: Jan 13,2004
Italy Italy
Main Product:

stone processing, mud removal, water filtration, polishing

user img
Mr.Peter Bernd Agostini
Tel: +393387808729
Adr: V.le Asmara 18 Riccione Rimini 47838 Italy
Visit Store
Categories:
Related Searchs: