pre-production inspection, during production inspection, final random inspection, Factory audit, container loading supervision
$0-0
pre-production inspection, during production inspection, final random inspection, Factory audit, container loading supervision
Our main check points are as below:
-Record the weather/ arrival time of container/ container No./ truck No.
-Check the inner & outer condition to see whether there is any damage/ wet/ hole/ peculiar smell.
-Check the quantity of goods loaded and record the condition of outer packaging (master cartons/ pallets)
-Randomly draw and open some cartons to verify that the goods meet with customer’s specification.
-Supervise the whole loading process.
-Record the seal No. and departure time of container
Performing a loading supervision will help you to:
-Make sure what is loaded in your container
-Perform a final check on the products, packing etc.
-Keep pressure on your vendor shoulders
-Save time and secure your business!