Mosaic Adhsive Mosaic Glue

Min Order : 500 Pieces
Supplier Detail
Foshan City Guanzhujingling Construction Material Co., Ltd
Established: Oct 01,2010
China China
Main Product:

Tile Adhesive/Sealant, Mosaic Adhesive /Sealant, Marble Adhesive/Sealant, Nature stone Adhesive/Sealant, Sealant , Waterproof Menbrane

user img
Mr.daniel liu
Tel: 0757-82724409
Adr: No. 11 of Shagang Ceramic Center,Foshan City, Guangdong Province, China.
Visit Store
Product Description

Products Use:

Small Paper ceramic tile and ground in common indoor and all kinds of mosaic metope the paste and seam filling;

Primary Treatment:

The base surface should be firm, smooth, clean, non-shaking, no grease, no wax, no release agent, no debris or other loose materials;

After the ceramic tile of laid of cement base surface shrinkage, hard enough. And has a basic flatness and verticality;

Such as hot weather or high water absorption of ceramic tiles, the face can be pre-wet, No obvious water is ok;

Mixing:

Add water by the proportion to the container(powder: water=4~3.8:1)

And then with a stirrer, stirring evenly to no grain of paste, static to 5-10 minutes, stirring again it, it can work at once. With no knot tablets, put it aside 5 minutes, stirring again, it can work at once;

In accordance with the preparation of the mixing material available about 8 hours;

The Construction Method

Firstly, apply mortar to tile on the back of a good mixing, Smear should pay attention to file the gap. Then use the tooth scraper will be awarded in the matrix slurry wall work surface, so that uniform distribution. Each mortar batch of about a square around, then tile adhesive on the work surface, ager the tap brick, tile adhesive sticking, brush the paper in the front of bricks with water. After the paper is full wet, ripping of the cardboard, check whether the gap of bricks is full with pulp, repaired the individual defective place, after ripping off the cardboard, use slight damp sponge to wipe the slurry, then the bricks can be washed by water after 24 hours;

Pay attention to

It must be first check the base surface before the construction;

The products are fit 5-40℃environment in use, can not be constructed in the case of rain

If need adjustment should be adjusted to 45 minutes after the shop is stuck;

Do not wash or get in the rain within 24 hours after laying bricks and bust be 5-7 days after that to prevent cold or exposure;

It should be water curing in 24 hours after construction;

Don’t clear it with hydrophilic acid whose concentration is more than 3%, use plenty of water to wash;

Packing: 25kgs/Bag

Storage: Stored in a cool dry place, sealed products can be stored for one year.

Categories:
Related Searchs: